Unconventional Well Production Using Hydraulic Jet Pump

 

  1. Jet Pump Downhole Equipment Configurations.
  2. Tubing String Installation Considerations.
  3. Surface Equipment Configurations.
  4. Surface Equipment Installation Considerations.
  5. Selection Process for Proper Nozzle/Throat Combination for the Frac Flow Back Process.
  6. Selection Process for Proper Nozzle/Throat Combination After the Frac Flow Back Process - Keeping Up with The Transient Productivity Index of the Well.
  7. Jet Pump Minimum Required Flowing Bottom Hole Pressure: How Low Can It Go?

Featured Speakers

Speaker: Osman A. Nunez-Pino
Speaker Osman A. Nunez-Pino

     Osman A. Nunez-Pino is a Mechanical Engineer with proven experience in Hydraulic Lift Systems, both Jet Pumps and Piston Pumps. After getting his Mechanical Engineering Degree at “La Universidad del Zulia” in Maracaibo – Venezuela in 2002, he started working on the oil field in Venezuela as Artificial Lift …

     Osman A. Nunez-Pino is a Mechanical Engineer with proven experience in Hydraulic Lift Systems, both Jet Pumps and Piston Pumps. After getting his Mechanical Engineering Degree at “La Universidad del Zulia” in Maracaibo – Venezuela in 2002, he started working on the oil field in Venezuela as Artificial Lift Field Engineer with Weatherford. Later in 2005, started his over-seas career at the Sultanate of Oman where Osman worked on the roles of Field Engineer (Baker-Centrilift), Field Supervisor (Baker-Centrilift), Applications Engineer and Operations Manager (Weatherford International).


    In 2013, he started a Hydraulic Lift Global Business Unit Applications Engineer role with Weatherford, based in Fort Worth, TX. In 2017 continued his jet pump career working for Liberty Lift Solutions, as Applications Engineer Hydraulic Lift.


    Osman has published several technical papers with the SPE and other oil & gas conferences, co-authored some technical articles about hydraulic lift systems and served as instructor of hydraulic lift technology at several locations around the world.

Full Description



Organizer

Mike Redburn

Mredburn@newpark.com


281-754-8629


Date and Time

Thu, June 14, 2018

9 a.m. - 4 p.m.
(GMT-0500) US/Central

Event has ended
View Our Refund and Cancellation Policy

Location

Newpark Drilling Fluids Office

21920 Merchants Way
Katy, Texas 77449
United States