SPE-GCS Continuing Education: Unconventional Well Production Using Hydraulic Jet Pump
Unconventional Well Production Using Hydraulic Jet Pump
- Jet Pump Downhole Equipment Configurations.
- Tubing String Installation Considerations.
- Surface Equipment Configurations.
- Surface Equipment Installation Considerations.
- Selection Process for Proper Nozzle/Throat Combination for the Frac Flow Back Process.
- Selection Process for Proper Nozzle/Throat Combination After the Frac Flow Back Process - Keeping Up with The Transient Productivity Index of the Well.
- Jet Pump Minimum Required Flowing Bottom Hole Pressure: How Low Can It Go?
Location:
Newpark Drilling Fluids Office
21920 Merchants Way
Katy
,
Texas 77449