Nov. 14, 2019


Description

Well diagnostics in deep, offshore GoM are vital in order to interpret any issues related to productivity losses.  This is especially important since any intervention in such wells is very costly.  Multiphase flow is amongst leading causes of well productivity loss.  This presentation shares an integrated workflow that provides a solution to the challenge of quantifying multiphase PTA results in single and multiple commingled production cases. The workflow is used to monitor the performance of several wells over an extended period in a deep-water offshore reservoir under water/aquifer drive. It builds on a succession of PTA tests starting from single phase flow until water breakthrough and beyond.  The results of historical PTA provided meaningful insights that were used as basis for actions that led to well and reservoir performance optimization.

 


Featured Speakers

Speaker: Arashi Ajayi
Speaker Arashi Ajayi

A licensed Professional Engineer with over 22 years’ experience in reservoir simulation, PTA, RTA, data analytics, Intelligent Well Technology, Distributed Temperature and Acoustic Sensing (DTS/DAS) technology. Started as a Reservoir engineer with Shell and later joined a technology startup WellDynamics that pioneered SmartWell technology. The company was later acquired by …

A licensed Professional Engineer with over 22 years’ experience in reservoir simulation, PTA, RTA, data analytics, Intelligent Well Technology, Distributed Temperature and Acoustic Sensing (DTS/DAS) technology. Started as a Reservoir engineer with Shell and later joined a technology startup WellDynamics that pioneered SmartWell technology. The company was later acquired by Halliburton. Left WellDynamics to start a private consulting company that focused on developing data-driven hydraulic fracture monitoring system, analytics-driven reservoir management and DTS/DAS solution platform. Joined Devon as a Reservoir Engineering Advisor after about 4 years of private consulting. Currently work for BHP as a Principal Reservoir Engineer.

Full Description



Organizer

Deepanshu Kumar


Date and Time

Thu, Nov. 14, 2019

11 a.m. - 1:30 p.m.
(GMT-0500) US/Central

Event has ended
View Our Refund and Cancellation Policy

Location

Fleming’s Prime Steakhouse (River Oaks)

2405 W Alabama St
Houston, Texas 77098
United States of America



Group(s): Reservoir