Sept. 14, 2004


Description

The Matterhorn Field is located in the Gulf of Mexico, Mississippi Canyon Block 243 (MC 243) in 2,811’ of water, 30 miles SE of the mouth of the Mississippi river and 100 miles SE of New Orleans (Louisiana). TOTAL E&P USA, Inc. has 100% ownership of the Matterhorn field development. The field will be developed from a Tension Leg Platform (TLP), a first for TOTAL. The development plan called for 8 total wells, 7 dry tree wells to be completed off of the TLP and 1 Sub-sea injector well.

Completion design and time allocated for the implementation was extremely short. The lessons learned were continuously incorporated into the completion process, making the operations and the completion program more efficient. A total of 16 from the original 17 dry tree well zones were treated. The sub sea well was abandoned. The deviation of the original program was due to a better understanding of the reservoir that could be obtained only during the completion phase.

The success of the completion project is attributed to the combination of right technology and teamwork.

Please register early online in order to facilitate the Northside study group to better plan and streamline the luncheon. Walk-ins will be accepted on a space available basis. Please arrive early, walk-ins are seated on a first come/first serve basis. Thank You

Featured Speakers

Speaker




Organizer

Mahadev Ammachathram


Date and Time

Tue, Sept. 14, 2004

11:30 a.m. - 1 p.m.
(GMT-0500) US/Central

Event has ended
View Our Refund and Cancellation Policy

Location

Greenspoint Club

16925 Northchase
Houston, Texas