March 28, 2012


Description

Lateral lengths for horizontal wells are increasing as production from conventional resources is on a decline and the need for energy independence is becoming apparent. Techniques to successfully complete these long laterals in a safe and most cost effective way become priority number one to the industry. Proven stimulation sleeves that offer more multi-entry points in a single zone are becoming one of the most important solutions to this challenge.  This presentation is a case study based on  and illustrates the success of sleeve technology for cemented applications in North America, including South Texas.

Featured Speakers

Speaker Yuyi Silumesii

Technical Advisor
Halliburton


Yuyi is a Technical Advisor at Halliburton Energy Services, working with horizontal and vertical completion products for both cemented and uncemented applications. He hold a Bachelor of Science degree in Electrical and Computer Engineering from BYU-Idaho.




Organizer

Mark Chapman


Date and Time

Wed, March 28, 2012

11:30 a.m. - 1 p.m.
(GMT-0500) US/Central

Event has ended

If you do not have a full-time job in the oil and gas industry, are a full-time student or Member in Transition (MiT) member, and you do not see a discounted registration fee for students/MiT regarding this event, please contact the GCS manager at spe-gcs@spe.org.


Location

Greenspoint Club

16925 Northchase Dr
Houston, Texas 77060