Description
Lateral lengths for horizontal wells are increasing as production from conventional resources is on a decline and the need for energy independence is becoming apparent. Techniques to successfully complete these long laterals in a safe and most cost effective way become priority number one to the industry. Proven stimulation sleeves that offer more multi-entry points in a single zone are becoming one of the most important solutions to this challenge. This presentation is a case study based on and illustrates the success of sleeve technology for cemented applications in North America, including South Texas.