Jan. 14, 2009


Description

 Salt drilling is still a relatively new practice and presents operators with many drilling challenges that are still not totally understood. Adding a directional component to drilling through salt not only magnifies the issues of traditional salt drilling, but introduces new challenges that require different approaches to ensure successful delivery. This presentation,  based on SPE 112669,  will discuss the challenges faced and the lessons learned by two major deepwater GoM operators along with the directional service company in drilling directionally through the salt. Together, these companies have drilled over 100,000-ft of salt in the GoM and are considered pioneers in deepwater salt drilling. They have encountered and managed many of the challenges that extend past the traditional predrill and real-time directional issues, into the post drilling phase with issues such as casing and cement design for managing salt loading and ensuring long term wellbore viability.

This presentation reviews several case studies that investigate and discuss directional drilling through salt, comparing variables such as hole size, bottomhole assembly (BHA) configuration, under-reamer selection, wellbore trajectory and directional control. The importance of geomechanics in the predrill planning of these directional salt wells is also discussed, and its link to casing design and cementing issues will be examined. The presentation concludes by identifying critical areas for success in drilling directionally through salt, and will attempt to identify current technical drilling limits for pushing this envelope even further.


Featured Speakers

Speaker John Shaugnessy

Drilling Engineer
BP America
John Shaughnessy
Drilling Engineer
BP America, Houston
 

John has  31 years in the industry with BP and Amoco, with most of that time in drilling along the Gulf Coast. He is currently assigned to the Atlantis Horse Project and has experience drilling in HT/HP and other challenging environments. John is a member …

Drilling Engineer
BP America

John Shaughnessy

Drilling Engineer

BP America, Houston


 



John has  31 years in the industry with BP and Amoco, with most of that time in drilling along the Gulf Coast. He is currently assigned to the Atlantis Horse Project and has experience drilling in HT/HP and other challenging environments. John is a member of SPE with a BS in Chemical Engineering from the University of Pittsburgh.



 


Full Description



Organizer

Kevin Brady


Date and Time

Wed, Jan. 14, 2009

11:30 a.m. - 1 p.m.
(GMT-0500) US/Central

Event has ended
View Our Refund and Cancellation Policy

Location

Greenspoint Club

16925 Northchase Drive
Houston, TX 77060
USA