Contact Information

  • Barbara Cortez
    +58 424 853 2321

Description

Petroleum engineer. 8 years experience in the oil industry. I have worked as a production engineer, reservoir engineer, project manager enginner. I am currently working as Project Manager for two spool construction projects in the Oil Upgrader Plant of Petropiar. Venezuela

Location

Puerto la Cruz, Venezuela

Experience

September 2019–January 2021.
CE7 Construction Company.

Client: Petropiar (PDVSA/Chevron)

Venezuela
Project Manager.
• Management of two spool construction projects in the Oil Upgrader Plant of Petropiar.
• Planning to reach the scope, document control, quality control, engineering development, procurement, manufacturing monitoring, contracting of equipment and services for the execution, logistics planning, and control of final execution.
• Ensuring the environmental and safety standards.

August 2015 – December 2015.
Oilfield and CBM (Mexico)

Client: TRENACO (Colombia and Venezuela)
Reservoir Engineer.
• Carrying out Exploitation Plan-type studies to the fields of the Orinoco Oil Belt (Venezuela).
• Applying the VCDSE methodology to the wells to be drilled.
• Monitoring the drilling plan (productive and unproductive times) of some assigned wells.
• Managing and planning service and personnel contracts.

June 2014-August 2015.
CBM Exploration and Production.

Clients: PEMEX and CNH (National Commission of Hydrocarbons Regulations)

Mexico
Reservoir Engineer.
• Design new offshore wells using FEL Methodology.
• Working with multidisciplinary team.
• Applying the methodology of Visualization, Conceptualization, Definition, Monitoring, and Evaluation in offshore new wells.
• Data management, reserve calculations, production forecasting, reservoir simulations, and nodal analysis calculations (simulations).
• Proposing updates of CNH regulations in different types of hydrocarbon fields.

December 2011-June 2014.
Petropiar (PDVSA/Chevron).

Venezuela
Reservoir Engineer/
Reservoir Monitoring Engineer.
• Evaluation of the path of new horizontal wells.
• Reservoir recommendations for new and existing wells.
• Multidisciplinary teamwork.
• Data management.
• Reserve calculations.
• Production forecasting.
• Nodal analysis calculations (simulations) and economic analysis.
• Decision-making about proposal of a new workover in a well.
• Evaluation and research of enhanced oil recovery (EOR) methods.
• Simulation of steam injection methods (cyclic and continuous).

August 2010–December 2011.
Petropiar (PDVSA/Chevron).

Venezuela
Production/Optimization Engineer.
• Selection, monitoring, and research of the artificial lift systems for extra heavy crude oil horizontal wells.
• Applying specialized tools and software.

Education

Bachelor’s degree: Ingeniero de Petroleo (Petroleum Engineer/Engineering).
University: Universidad de Oriente. Venezuela.
GPA: 8.08/10. Position: 1/66. Distinction: Cum Laude