2007 Electrical Submersible Pump Workshop

2007 ESP Workshop

The Woodlands Waterway Marriott Hotel, The Woodlands, Texas
Preliminary AGENDA

Wednesday, April 25, 2007

SESSION I – Alternate Deployed and Specialty Applications
CO-CHAIRS Noel Putscher / Ralph Harding

8:30 Keynote Speaker: Frank Komin, President and General Manager, Thums Long Beach Co
9:30 The World’s First Wireline Retrievable ESP System
Neil Griffiths, Vishal Gahlot, Steve Sakamoto, Frank Claborn Shell International Exploration and Production B.V. / Wood Group ESP Inc. Limited
10:00 BREAK
10:30 The First Riser Deployed ESP in the Gulf of Mexico
David Cocciolone, Mike Parker, Anadarko Petroleum Company Tiffany Pitts, Mark Ohl, Baker Hughes Centrilift
11:00 Electric Submersible Pumps in Low Volume Rod Pump Applications
Jeff Finnell, Chesapeake Energy Corporation, Malcolm Rainwater, Wood Group ESP Inc.
11:30 Cliffhead: Coil Tubing Deployed ESPs Installed Offshore Australia
Simon Daniel – ROC Oil Ltd., John Mack, Ian Ayling, Derek Sinclair – Baker Hughes Centrilift
12:00 LUNCH

 

SESSION II – Specialty Applications
CO-CHAIRS Rafael Lastra / Steve Kennedy

 

1:00 Powered Dumpflood Wells Provide Pressure Support for ExxonMobil Chad Reservoirs
Tom Van Akkeren, E. Jake Kamps, Production Technology Associates
1:30 ESP in Caisson - A novel application of ESPs for “deep water” Artificial Lift
Dustan Gilyard – Shell International Exploration and Production, Norman Ritchie – Link Project Services
2:00 Experiences of Occidental Colombia using the Automatic Diverter Valve
Juan Carlos Trujillo, Occidental Colombia, Paul Shotter Pumptools Limited
2:30 BREAK
3:00 Local Experiences Gained Through The Application of Dual Y Tool ESP Systems in Qatar
Emmanuel Pradie, Joanes Bertin -TOTAL, Khaled Elsheikh, Reza Dadrass, Brian Scott, Remi Arseneault - Schlumberger
3:30 ESP Configurations Used by NEXEN INC for CBM Dewatering in Manville Coal Seams in Ft. Assiniboine area of Alberta, Canada
Dana Pettirgrew, NEXEN, Richard Bushong, Schlumberger, Patricia Castillo, Weatherford
4:00 Breakout Session
6:00 COCKTAIL PARTY

 

Thursday, April 26, 2007

SESSION III – Harsh Environments
CO-CHAIRS: Atika al Bimani / Chip Ollre

 

8:30 Using the Calibrated-Tested Pumping Instrument (ELECTRICAL SUBMERSIBLE PUMP) for Continuous Fluid Measurement When Producing Heavy Oil Wells
William D. Bolin, KerrMcGee
9:00 Challenges and Solutions during ESP Application in Harsh Environment: With high output of mechanical impurities and with scaling
Sergei Rusakov, Alexander Kaplan, Mr. Ali Nagiev, Sergey Anufriev, SIBNEFT
9:30 ESP Technology Advances for CO2 Flood Projects
Blair Eddy, EnCana Corporation, Brad Ward, Baker Hughes Centrilift
10:00 BREAK
10:30 SpiderMax Project
Carlos Brunings, Pedro Vasquez, Reinaldo Figuera – PDVSA, Cesar Ayala, Jesus Vitoria- Centrilift
11:00 Field Performance Evaluation – Advanced Gas Handler (AGH)
Zhizhuang Jiang, ConocoPhillips China Inc., Zhou Zhen Guo, Schlumberger
11:30 Evaluation of Electric Submersible Pumps for heavy oil. Well CIB 260 – Morichal District
Ana Sosa, Emmaris Manrique, Marcelo Ramos, Juan Brown, PDVSA
12:00 LUNCH

 

SESSION IV – Electrical / Surveillance / Optimization
CO-CHAIRS Amanda Rovira / Kenneth Lacey



1:00 CMB (Controlled Motor Behavior) Soft Start Optimizes Submersible Motor Performance
Rebecca Larkin, Kinder Morgan Salvatore F. Grande, Magne Grande, Kenneth Lacey, Custom Submersible and Electrical Services
1:30 Stray-Current Corrosion Study of PDO’s ESP Systems
I. A. Metwally, H. M. Al-Mandri, A. Gastli, Sultan Qaboos University, A. Al-Bimani, PDO
2:00 "67% Free Gas into Pump at 200 psi - By Accident" SHORT STORY
Jason Estep, Imperial Oil Resources
2:15 Committee Introduction and Presentation
2:30 BREAK
3:00 Focus ESP Surveillance in Sensitive Conditions: Benefits and Challenges
Ibrahim Al-Siyabi, Hamed Al-Sharji, Atika Al-Bimani; - PDO
3:30 ESP Process Optimization Results in Longer Run Lives and Incremental Production – A Case History from Block 1AB in Northeastern Peru
Luis Pantoja, Renato Alegre and Marcial Cruz, Pluspetrol Peru S.A., Manuel Loli, Mateo Sersen and Jose G. Flores, Schlumberger
4:00 Break Out Session II
6:00 Crawfish Boil

 

Friday, April 27, 2007

SESSION V – Operations / Run Life Improvement
CO-CHAIRS: Gabriel Diaz / Tom Van Akkeren

8:30 ESP Operation, Optimization and Performance Review; ConocoPhillips China Inc. Bohai Bay Project
Zhizhuang Jiang, Conoco Phillips Bassam Zreik , Schlumberger
9:00 How to make your ESPs last longer
Luud W. Dorrestijn,Chevron Exploration & Production Netherlands
9:30 Enhancing Waterflood Project (PAE)
Diego Leiguarda, Ricardo Mazzola - Pan American Energy
10:00 BREAK
10:30 Streamline Operation of ESP Systems in ECUADOR TLC
Edison Bedoya, Isaac Flores, Dalton Muñoz, Petrobras, David Amores, Jose Leon, Diego Narvaez, Schlumberger
11:00 COTL Block B8/32 ESP Pilot Program
Gary G. Thompson, Chevron Thailand
11:30 Evaluation of ESP Campaign
Eugene Esor, SPE, and Ahmed Hassouna, Nigerian Agip Oil Co. Ltd; Olukayode Oladoyin, Schlumberger
12:00 Closing Comments
N. Putscher – ESP Workshop Chair

I agree

This website stores data such as cookies to enable necessary site functionality, including analytics, targeting and personalization. By using our website, you agree to our Privacy Policy and cookies usage.