C&P: "Development of a 20,000 psi Drilling, Completion, Intervention, Subsea & Subsurface Equipment in 60,000 ft. water depth in the GoM

Anadarko has discovered a field in the GoM where the MASP at the mudline exceed 15,000 psi, therefore Anadarko has assemble a “20A” team consisting of experts in the design development, manufacture, and inspection of Drilling, Completions, Intervention, Subsea and Subsurface Equipment in a 20,000 psi environment.  This presentation will explain the the development concepts and challenges ahead in a 20,000 psi development for the GoM including: technical and quality requirements for equipment; the design verification and testing validation for this equipment to meet the regulatory requirements; and methods to monitor the manufacture, inspection, and factory acceptance testing.

Location: Greenspoint Club
16925 Northcase Drive
Houston , Texas 77060

Date: Nov. 19, 2014, 11:30 a.m. - Nov. 19, 2014, 1 p.m.