Projects, Facilities, and Construction Dinner

Event ticket purchase is required.

"Determining the Basis of Design for PF&C Projects – Why Facilities Engineers Need to Think"

Panelists: David Aron (PDC), Mark Hollar (SBM), Maurice Mullaly (Worley Parsons), and Luigi Saputelli (Frontender)

Oil and gas production is fraught with uncertainty. Reservoir properties are determined from very limited information. Until production startup we have only estimates of the most important design parameters including production flowrate, oil gravity, GOR, gas density, water composition, etc. And many of these variables will change over time. An initial Basis of Design may constrain the facility design to meet specific parameters with little flexibility built in to account for reservoir uncertainties or the effects on facility Capex and Opex in trying to accommodate the wish lists of reservoir engineers.

Join us as we discuss the impact of reservoir uncertainty from a projects, facilities and construction point of view. Invited panelists will present reservoir engineering, operating company and detailed design perspectives.

Sponsored by Gate, LLC and Cetco Energy Services

 

Register here!

Location: Room 218, Second Level, Ernest N. Morial Convention Center
900 Convention Center Blvd.
New Orleans , LA 70130

Date: Sept. 30, 2013, 7 p.m. - Sept. 30, 2013, 10 p.m.