PF&C: Expanding Facilities Knowledge Workshop Session 3 - Production Systems Introduction

Part 3 of the 5 part Expanding Facilities Knowledge series, this session presents the typical upstream production system.  This session aims to present the factors that influence the upstream production system evolution throughout the design through to installation.  Offshore as well as onshore production systems will be presented along with some of the key differences.  The interaction between all the key stakeholders influencing the design from downhole, flow assurance, owner, and operator through to pipeline and end user sales contracts will be presented.  Some of the tools and software used to develop these systems will also be presented.
 
This workshop is aimed at imparting basic concepts and facilities knowledge to graduate new hires and summer interns of EP companies and contractors, while allowing opportunities for networking with other young industry professionals in the industry.
Parking in the front of the building (between the feeder road and the office) then report to the receptionist (Linda) for sign in and directions to the training room.
 
Space is limited for a total of 32 attendees.  A second workshop can be scheduled if there is the demand.

Location: Cameron Flow Control
4901 W Sam Houston Pkwy
Houston , TX 77041

Date: July 10, 2012, 4 p.m. - July 10, 2012, 6 p.m.