BEGIN:VCALENDAR VERSION:2.0 METHOD:PUBLISH PRODID:-//Tendenci - The Open Source AMS for Associations//Tendenci Codeba se MIMEDIR//EN BEGIN:VEVENT DESCRIPTION:--- This iCal file does *NOT* confirm registration.\r\nEvent d etails subject to change. ---\r\nhttps://www.spegcs.org/events/2382/\r\n\r \nEvent Title: Projects, Facilities, and Construction Dinner\r\nStart Date / Time: Sep 30, 2013 19:00 PM America/Chicago\r\nLocation: Room 218, Seco nd Level, Ernest N. Morial Convention Center\r\nGoogle\r\nhttp://maps.goog le.com/maps?q=900+Convention+Center+Blvd.,New Orleans,LA,70130\r\n\r\nFore cast\nhttp://www.weather.com/weather/monthly/70130\r\n\r\nEvent ticket pur chase is required.\r\n"Determining the Basis of Design for PF&\;C Proje cts &ndash\; Why Facilities Engineers Need to Think"\r\nPanelists: David Aron (PDC), Mark Hollar (SBM), Maurice Mullaly (Worley Parsons), and Luigi Saputelli (Frontender)\r\nOil and gas production is fraught with uncerta inty. Reservoir properties are determined from very limited information. Until production startup we have only estimates of the most important des ign parameters including production flowrate, oil gravity, GOR, gas densi ty, water composition, etc. And many of these variables will change over time. An initial Basis of Design may constrain the facility design to mee t specific parameters with little flexibility built in to account for res ervoir uncertainties or the effects on facility Capex and Opex in trying to accommodate the wish lists of reservoir engineers.\r\nJoin us as we dis cuss the impact of reservoir uncertainty from a projects, facilities and construction point of view. Invited panelists will present reservoir engi neering, operating company and detailed design perspectives.\r\n\r\n\r\n\r \n\r\nSponsored by Gate, LLC and Cetco Energy Services\r\n \r\nRegister he re!\r\n\r\n\r\n\r\n--- This iCal file does *NOT* confirm registration.Even t details subject to change. ---\r\n\r\n--- By Tendenci - The Open Source AMS for Associations ---\r\n UID:uid2382@spegcs.org SUMMARY:Projects, Facilities, and Construction Dinner DTSTART:20131001T000000Z DTEND:20131001T030000Z CLASS:PUBLIC PRIORITY:5 DTSTAMP:20240328T105407Z TRANSP:OPAQUE SEQUENCE:0 LOCATION:Room 218, Second Level, Ernest N. Morial Convention Center X-ALT-DESC;FMTTYPE=text/html:
Event ticket purchase is required.
Panelists: Davi d Aron (PDC), Mark Hollar (SBM), Maurice Mullaly (Worley Parsons), and Luigi Saputelli (Frontender)
Oil and gas production is fraught with uncertainty. Re servoir properties are determined from very limited information. Until pr oduction startup we have only estimates of the most important design para meters including production flowrate, oil gravity, GOR, gas density, wate r composition, etc. And many of these variables will change over time. An initial Basis of Design may constrain the facility design to meet specif ic parameters with little flexibility built in to account for reservoir u ncertainties or the effects on facility Capex and Opex in trying to accom modate the wish lists of reservoir engineers.
Join us as we discuss the impact of reservoir uncertainty from a projects, facilities and cons truction point of view. Invited panelists will present reservoir engineer ing, operating company and detailed design perspectives.
Sponsored by Gate, LLC and Cetco Energy Services  \; Register here! |