BEGIN:VCALENDAR VERSION:2.0 METHOD:PUBLISH PRODID:-//Tendenci - The Open Source AMS for Associations//Tendenci Codeba se MIMEDIR//EN BEGIN:VEVENT DESCRIPTION:--- This iCal file does *NOT* confirm registration.\r\nEvent d etails subject to change. ---\r\nhttps://www.spegcs.org/events/1933/\r\n\r \nEvent Title: SPEI: Horizontal Well Completions\r\nStart Date / Time: Ju n 05, 2012 08:30 AM US/Central\r\nLocation: SPEI Houston Training Center\r \nSpeaker: Aaron Burton and Sudiptya Banerjee\r\nGoogle\r\nhttp://maps.goo gle.com/maps?q=10777+Westheimer+Rd.,Houston,TX,77042\r\n\r\nForecast\nhttp ://www.weather.com/weather/monthly/77042\r\n\r\n\r\n REGISTER NOW: http:/ /www.spe.org/training/courses/HWC.php \r\n\r\n \r\n\r\n \r\n \r\n Desc ription\r\n \r\n \r\n \r\n This 1-day course develops strategies for co mpleting horizontal wells. It covers both cased-hole and open-hole configu rations, either with or without sand control. Participants will learn the applications and dynamics of horizontal wells, including drill-in fluids, hole displacement, cementing, perforating, and stimulation. They will also learn the guidelines for selecting stand-alone screens and executing hori zontal gravel packs. Topics include:\r\n &bull\; Completion options\r\n &bull\; Cased-hole horizontal completions\r\n &bull\; Perforating a nd stimulating horizontal wells\r\n &bull\; Open-hole horizontal comple tions\r\n &bull\; Drill-in fluids\r\n &bull\; Zonal isolation and in flow control\r\n &bull\; Displacing the drill-in fluid\r\n \r\n \r\n \ r\n \r\n Why You Should Attend\r\n \r\n \r\n \r\n Horizontal d rilling was a step-change in the industry, but the technology is more expe nsive and riskier than drilling vertical or deviated wells. As a drilling, completion or reservoir engineer, it is important for you to understand t he many challenges and options of horizontal drilling.\r\n \r\n \r\n \r\n \r\n \r\n Who Should Attend\r\n \r\n \r\n \r\n This course i s designed for drilling, completion and reservoir engineers, and for servi ce company personnel involved with planning, drilling, completing and oper ating horizontal wells.\r\n \r\n \r\n \r\n \r\n \r\n CEUs\r\n \r\n \r\n \r\n 0.8 CEUs (Continuing Education Units) awarded for this 1- day course.\r\n \r\n \r\n\r\n\n\n--- This iCal file does *NOT* confirm re gistration.Event details subject to change. ---\r\n\r\n--- By Tendenci - T he Open Source AMS for Associations ---\r\n UID:uid1933@spegcs.org SUMMARY:SPEI: Horizontal Well Completions DTSTART:20120605T133000Z DTEND:20120605T223000Z CLASS:PUBLIC PRIORITY:5 DTSTAMP:20240329T092503Z TRANSP:OPAQUE SEQUENCE:0 LOCATION:SPEI Houston Training Center X-ALT-DESC;FMTTYPE=text/html:
This 1-day course develops str
ategies for completing horizontal wells. It covers both cased-hole and ope
n-hole configurations, either with or without sand control. Participants w
ill learn the applications and dynamics of horizontal wells, including dri
ll-in fluids, hole displacement, cementing, perforating, and stimulation.&
nbsp\;They will also learn the guidelines for selecting stand-alone screen
s and executing horizontal gravel packs. \;Topics include:
&nbs
p\;&bull\; Completion options
 \;&bull\; Cased-hole horizontal
completions
 \;&bull\; Perforating and stimulating horizontal w
ells
 \;&bull\; Open-hole horizontal completions
 \;
&bull\; Drill-in fluids
 \;&bull\; Zonal isolation and inflow c
ontrol
 \;&bull\; Displacing the drill-in fluid
Horizontal drilling was a step-change in the industry, but the technology is more expensive and riskier than drilling vertical or de viated wells. As a drilling, completion or reservoir engineer, it is impor tant for you to understand the many challenges and options of horizontal d rilling.
This course is designed for d rilling, completion and reservoir engineers, and for service company perso nnel involved with planning, drilling, completing and operating horizontal wells.
0.8 CEUs (Continuing Education Units) award ed for this 1-day course.