BEGIN:VCALENDAR VERSION:2.0 METHOD:PUBLISH PRODID:-//Tendenci - The Open Source AMS for Associations//Tendenci Codeba se MIMEDIR//EN BEGIN:VEVENT DESCRIPTION:--- This iCal file does *NOT* confirm registration.\r\nEvent d etails subject to change. ---\r\nhttps://www.spegcs.org/events/3481/\r\n\r \nEvent Title: HSSE-SR: Work as Imagined vs. Work as Done\r\nStart Date / Time: Jan 10, 2017 11:30 AM US/Central\r\nLocation: Marathon Conference Ce nter Rm P1021\r\nSpeaker: Mary Beth Mucahy\r\nGoogle\r\nhttp://maps.google .com/maps?q=5555+San+Felipe,Houston,Texas,77056\r\n\r\nForecast\nhttp://ww w.weather.com/weather/monthly/77056\r\n\r\nOn April 20, 2010, a multiple-f atality incident occurred at the Macondo oil well approximately 50 miles o ff the coast of Louisiana in the Gulf of Mexico during temporary well-aban donment activities on the Deepwater Horizon drilling rig. Control of the w ell was lost, resulting in a blowout&mdash\;the uncontrolled release of oi l and gas) from the well. On the rig, the hydrocarbons found an ignition s ource and ignited. The resulting explosions and fire led to the deaths of 11 individuals, serious physical injuries to 17 others, evacuation of 115 individuals from the rig, sinking of the Deepwater Horizon, and massive ma rine and coastal damage from a reported 4 million barrels of released hydr ocarbons.\r\nThe U.S. Chemical Safety Board (CSB) released its final inves tigation report from this incident in April 2016. The CSB builds on previo usly published investigation reports by analyzing evidence that, in some r espects, became available only following their publication. The focus of t his presentation will be to provide highlights regarding the drilling cont ractor/operator relationship. As exemplified at Macondo, the operator and drilling contractor must actively work to bridge the gap between work-as-i magined (WAI) in the drilling program and work-as-done (WAD) by the well o perations crew.\r\nPARKING AND ADDITIONAL INFORMATION:\r\nVisitor parking is available in the Visitor Garage, levels G-1 and G-2. Parking is metered and payable by credit card only. All visitors must check-in on level 2 at either the Tower Concierge Desk or the Marathon Oil Corporation Reception Desk. Please have photo identification available upon check-in.--- This i Cal file does *NOT* confirm registration.Event details subject to change. ---\r\n\r\n--- By Tendenci - The Open Source AMS for Associations ---\r\n UID:uid3481@spegcs.org SUMMARY:HSSE-SR: Work as Imagined vs. Work as Done DTSTART:20170110T173000Z DTEND:20170110T190000Z CLASS:PUBLIC PRIORITY:5 DTSTAMP:20240329T113626Z TRANSP:OPAQUE SEQUENCE:0 LOCATION:Marathon Conference Center Rm P1021 X-ALT-DESC;FMTTYPE=text/html:
On April 20, 2010, a multiple-fatality incident occurred at the Macondo oil w ell approximately 50 miles off the coast of Louisiana in the Gulf of Mexic o during temporary well-abandonment activities on the Deepwater Horizon dr illing rig. Control of the well was lost, resulting in a blowout&mdash\;th e uncontrolled release of oil and gas) from the well. On the rig, the hydr ocarbons found an ignition source and ignited. The resulting explosions an d fire led to the deaths of 11 individuals, serious physical injuries to 1 7 others, evacuation of 115 individuals from the rig, sinking of the Deepw ater Horizon, and massive marine and coastal damage from a reported 4 mill ion barrels of released hydrocarbons.
The U.S. Chemical Safety Boar d (CSB) released its final investigation report from this incident in Apri l 2016. The CSB builds on previously published investigation reports by an alyzing evidence that, in some respects, became available only following t heir publication. The focus of this presentation will be to provide highli ghts regarding the drilling contractor/operator relationship. As exemplifi ed at Macondo, the operator and drilling contractor must actively work to bridge the gap between work-as-imagined (WAI) in the drilling program and work-as-done (WAD) by the well operations crew.
PARKING AND ADDITIO NAL INFORMATION:
Visitor parking is available in the Visitor Garage , levels G-1 and G-2. Parking is metered and payable by credit card only. All visitors must check-in on level 2 at either the Tower Concierge Desk o r the Marathon Oil Corporation Reception Desk. Please have photo identific ation available upon check-in.