Wednesday, May 20 2015

11:30 AM - 1 PM
Wednesday, May 20, 2015 11:30 a.m.

The task of identifying key production drivers in unconventional reservoirs remains challenging, even after decades of exploration and production in North America during which tens of thousands of horizontal unconventional wells have been drilled and completed.  Tens to hundreds of variables, categorized as reservoir quality, well architecture, completion, stimulation, and production metrics, are involved, and …
11:30 AM - 1 PM
Wednesday, May 20, 2015 11:30 a.m.

When re-pressurizing a producer well by directly pumping into the wellbore or by indirectly fracturing into it, one will preferentially provoke shear slips in the depleted section.  These events can be detected by microseismic monitoring methods and collected into a 3D description of the depleted volume.  We describe the concept of Microseismic Depletion Delineation, MDD, …
5 PM - 8 PM
Wednesday, May 20, 2015 5 p.m.
7:30 AM - 5 PM
Wednesday, May 20, 2015 7:30 a.m.
Multi-day Event

  About this Symposium The SPE Produced Water Handling and Management Symposium is designed to be the capstone event for several water-related SPE conferences and workshops that have been held in Houston and various locations around the world. This event will include prominent keynote speakers, invited papers, exhibiting companies, and networking opportunities. The symposium will …
11 AM - 1 PM
Wednesday, May 20, 2015 11 a.m.

  More details to follow. When: Wednesday, 20 May from 1100 to 1300 hours CDT Where: Norris Conference Center, CityCentre, 816 Town & Country Blvd., Suite 210, Houston, TX Registration Fee: SPE Member: USD 40, Nonmember: USD 50 Register today! Program Agenda 1100–1130: Registration and Networking   1130–1300: Lunch   1200–1300: Presentation and Q&A   …
12 PM - 1 PM
Wednesday, May 20, 2015 noon

The task of identifying key production drivers in unconventional reservoirs remains challenging, even after decades of exploration and production in North America during which tens of thousands of horizontal unconventional wells have been drilled and completed.  Tens to hundreds of variables, categorized as reservoir quality, well architecture, completion, stimulation, and production metrics, are involved, and …