Skip to Content

This event has passed

PF&C: Offshore Wind Power at Greater Gabbard: A Case Study

Sponsored by Study Group - Projects, Facilities and Construction

Tuesday 15-Sep-09 11:30 AM to 1:00 PM CDT

We were unable to register you for this event as the event deadline has passed or the maximum number of seats available has been reached.
Total Seats: 100
Reserved: 61

Houston Racquet Club

10709 Memorial Drive
Houston TX 77024 US
Google Maps | Hotels Near | Yahoo! Maps | Weather Forecast
Phone: (713) 464-4811

Speaker Michael Bateman, P.E.

Position: VP of Technology and Sales
Company: Heerema Fabrication Group Engineering

Event Description

Wind Power is an up-and-coming technology that is finding its way offshore. Turbines have grown and become more efficient, allowing them to be economically placed in ever deeper waters. In the European North Sea, ideal winds combined with political conditions have led to a recent boom in development and construction activities in the offshore wind sector. 

The Greater Gabbard Offshore Wind Farm is scheduled to come online in mid 2010. The field consists of 140 wind turbines and two hub platforms to be installed off the eastern seaboard of the United Kingdom. Once in place, the field will be the largest development of its type in the UK, generating 504MW of electrical power.  

Heerema has been part of the design and execution team for the Greater Gabbard field as well as several other developments. In this presentation, we will attempt to give an overview of the offshore wind business, its challenges, and potential through a case study of the Greater Gabbard Farm.
Attachments
 

 Event Contact

 Event Coordinator

Bob Chin Bob Chin
(713) 245-7233 FAX (713) 245-7233 FAX
   

PF&C: Offshore Wind Power at Greater Gabbard: A Case Study

Sponsored by Study Group - Projects, Facilities and Construction

Tuesday 15-Sep-09 11:30 AM to 1:00 PM CDT

Speaker Michael Bateman, P.E.

Position: VP of Technology and Sales
Company: Heerema Fabrication Group Engineering

Biography

Mike Bateman has worked in the offshore oil and gas business for 15 years. He has served as a structural engineer, project manager, and technology developer at different times in his career, culminating in his current assignment leading HFGE’s efforts in the wind business. Mr. Bateman first became involved in the wind business in 2003 when the turbines began their migration from shore-based systems to offshore wind farms. He has since been involved in three major offshore wind developments in Northern Europe and has worked on projects and/or technology development in the wind field for GE, Siemens, ABB, and British Gas.

PF&C: Offshore Wind Power at Greater Gabbard: A Case Study

Sponsored by Study Group - Projects, Facilities and Construction

Tuesday 15-Sep-09 11:30 AM to 1:00 PM CDT

Houston Racquet Club

10709 Memorial Drive
Houston TX 77024 US
Google Maps | Hotels Near | Yahoo! Maps | Weather Forecast
Phone: (713) 464-4811

PF&C: Offshore Wind Power at Greater Gabbard: A Case Study

Sponsored by Study Group - Projects, Facilities and Construction

Tuesday 15-Sep-09 11:30 AM to 1:00 PM CDT

 
Before
14-Sep-09 8:30 AM
After
14-Sep-09 8:30 AM
Member:
$35.00
$45.00
Non-Member:
$40.00
$45.00
 
Optional Events/Items
Vegetarian Meal Request $0.00
Start: 15-Sep-09 11:30 AM End: 15-Sep-09 1:00 PM 
Description: Please select this for a vegetarian meal.

 


Add to Favorites