Skip to Content
Go to SPE International Web Site Go to Gulf Coast Section Home Page
Get Involved in SPEGCS, the Society of Petroleum Engineers Gulf Coast Section for Careers in the Engineering and Oil and Gas Industry
site sponsors
Signa - site sponsor
RPSEA_Logo
site sponsors
 
SPEGCS Log-in
User Name:
Password:
Remember Login:
 
Forgot your password?
 
Or, to request a login for this site, click here.

SPE-GCS
Kathy MacLennan

10777 Westheimer Road,
Suite 1075
Houston, TX 77042

tel: 713.779.9595
fax: 713.779.4216
SPEGCS * Society of Petroleum Engineers Gulf Coast Section * Leading the engineering industry in resources for careers, information, jobs, events, education, society, leadership, and community

 

PF&C: The Development of Cascade and Chinook Fields in Ultra Deep Waters in the Gulf of Mexico

Sponsored by Study Group - Projects, Facilities and Construction

Tuesday 20-Jan-09 11:30 AM to 1:00 PM CST

Speaker: Cesar Palagi, Walker Ridge Production Asset Manager
Petrobras America Inc.

We were unable to register you for this event as the event deadline has passed or the maximum number of seats available has been reached.

Houston Racquet Club
10709 Memorial Drive
Houston Texas 77024
Google Maps | Hotels Near | Yahoo! Maps | Weather Forecast

Phone: (713) 464-4811

Details for "PF&C: The Development of Cascade and Chinook Fields in Ultra Deep Waters in the Gulf of Mexico"

Please arrive early as this is a full capacity event and registration may take a bit longer than usual. Thanks for your support!

Walk-ins to replace no shows will be granted on a first come first serve basis. Please arrive early to be placed on a wait list.

 
The Cascade and Chinook fields are located in the Walker Ridge Outer Continental Shelf (OCS) leasing area of the central Gulf of Mexico. There are no production analogs for these two fields and a phased development is justified because of reservoir uncertainties. The purpose of Phase 1 is to analyze reservoir performance to enable optimization of future project development phases or conversely, to minimize investment in the event of failure.  

Cascade was discovered in 2002 and Chinook in 2003. The discoveries, among others, defined a new hydrocarbon trend in the Gulf of Mexico ultra-deep water. The hydrocarbon bearing sandstones are equivalent to the Wilcox Group (Eocene-Paleocene), a prolific producing sediment onshore Gulf of Mexico. Cascade is located about 160 miles south of the Louisiana coast in 8,200 ft water depth and Chinook is about 15 miles south of Cascade in 8,700 ft water depth. Wells will be drilled to a total depth of approximately 27,000 ft. 

The Cascade field is owned by Petrobras America Inc. (50%) and Devon Energy Production Company, L.P. (50%), while the Chinook field is owned by Petrobras America Inc. 66.67% and TOTAL E&P USA, INC. (33.33%). Petrobras operates both fields. 

Phase 1 will consist of two subsea wells in Cascade and one subsea well in Chinook tied back to a disconnectable turret moored FPSO, with first production estimated for mid 2010. Oil (18o to 27o API) will be transported from the field in shuttle vessels to terminals of opportunity along the Gulf coast from Texas to Mississippi and gas will be exported through a gas export pipeline. The minimum amount of infrastructure will be installed in Phase 1; however, the development concept is very flexible and enables multiple development scenarios in future phases and up to 80,000 bopd of production. 

Speaker Cesar Palagi

Cesar Palagi is the Walker Ridge Production Asset Manager with Petrobras America Inc., based in Houston.  Mr. Palagi is responsible for the design and implementation of development projects of ultra-deep waters, lower tertiary fields in the Gulf of Mexico.  He has provided technical and managerial E&P services to Petrobras for 28 years. 

Mr. Palagi graduated in Civil Engineering, at Universidade Federal do Rio Grande do Sul, and holds a M.Sc. degree from Universidade Federal de Ouro Preto, Brazil, and a Ph.D from Stanford University, United States, both in petroleum reservoir engineering.

Register by Monday   19-Jan-09 11:30 AM  CST Seats 210
Reserved 204

Pricing

 
Before 19-Jan-09
After 19-Jan-09
Member:
$35.00
$45.00
Non-Member:
$40.00
$45.00
 
Become a member! View our membership application form.
 
We were unable to register you for this event as the event deadline has passed or the maximum number of seats available has been reached.

Comments

Please arrive early as this is a full capacity event and registration may take a bit longer than usual. Thanks for your support!
 
 

 Event Contact

 Event Coordinator

Bob Chin Bob Chin
(713) 245-7233 FAX (713) 245-7233 FAX
   

Help increase awareness for this SPE-GCS event with these resources!

Upcoming SPE-GCS events for Study Group - Projects, Facilities and Construction:
Expanding Facilities Knowledge Workshop-Valves on Tuesday 14-Jul-09 4:00 PM
Expanding Facilities Knowledge Workshop-Electrical and Instrumentation on Tuesday 28-Jul-09 4:00 PM
Expanding Facilities Knowledge Workshop-Subsea on Tuesday 11-Aug-09 4:00 PM
PF&C: Offshore Wind Power ar Greater Gabbard: A Case Study on Tuesday 15-Sep-09 11:30 AM
PF&C: Diagnosing and Resolving Chemical and Mechanical Problems on Wednesday 13-Jan-10 11:30 AM


Tags:

Add to Favorites

E-mail To A Friend E-mail this event to a friend (requires login).